COURIER CHECK-IN PLAQUE

Installation instructions.

Installation instructions.

Peel. Stick. Tap.

Courier tapping the installed Uber Eats plaque at a restaurant
Cleaning and drying the plaque mounting surface
Cleaning and drying the plaque mounting surface

01

Clean and prepare the surface.

Wash with warm water and a small amount of dish soap to remove dirt, dust, grease, oil and residue. Rinse with clean water and dry completely. Isopropyl alcohol may be used as a final wipe after washing if desired.

Removing the release liner from the plaque mounting strips

02

Remove the release liners.

Peel the red release liners from the back of the plaque. Avoid touching the exposed adhesive.

Positioning the Courier Check-In plaque on the selected surface

03

Position the plaque.

Place the plaque in the final location. Make sure it is level and correctly positioned before pressing.

Pressing firmly across the complete Courier Check-In plaque

04

Press firmly across the entire plaque.

Apply even pressure for 30-60 seconds, especially around every edge.

Installed Courier Check-In plaque while the adhesive bond builds

05

Allow the bond to build.

Leave the plaque undisturbed for at least 24 hours before heavy use. Typical full bond strength is reached in 72 hours.

Verifying the installed Courier Check-In plaque with a phone tap

06

Verify the check-in tap.

Tap the installed plaque with a phone and confirm that the correct check-in experience opens.

BEFORE YOU PEEL

Choose a sound, fully cured surface.

The surface must be clean, dry and free of grease, oil, silicone and cleaning residue.

Suitable surfaces

✓ Painted drywall with fully cured, well-adhered paint
✓ Glass and storefront glass
✓ Metal doors, frames and coated metal
✓ Front counters and host stands
✓ Tile and sealed masonry
✓ Sealed wood
✓ Drive-thru structures and protected exterior walls

Important notes

• Apply only to sound, fully cured finishes.
• Avoid loose paint, porous or crumbling surfaces, and heavily textured areas.
• Removal may damage paint or the wall finish.

AFTER INSTALLATION

Give the bond time to build.

Confirm the tap, then leave the plaque undisturbed for at least 24 hours before heavy use. Typical full bond strength is reached in 72 hours.

Back to Courier Check-In